"GRAND OPENING DECEMBER 2ND 2026, 6755 PROSPECTOR LANE, PARKER, CO 80134." That is the wording of the store's hiring flyer, as DougCo Social reported in late October. The flyer was shared on Nextdoor and in a Parker community Facebook group. Neighbors have started calling it the Pinery King Soopers. Inside Kroger it is Store 175.
The grocery store is the obvious headline. The land next to it is the bigger change. On the north side of Wellspring Drive, Douglas County has approved a plan that splits 47.62 acres into 19 commercial lots. Applications for specific businesses there were already arriving this summer and fall. The King Soopers is the anchor for a district that is still mostly empty grassland.
What the store itself is
The store is large. Douglas County's March 2026 hazard mitigation plan lists "King Soopers – Pinery Village" at 6755 Prospector Lane as a 132,000-square-foot retail building. At that point its plans were approved and construction was underway. Search Parker's November Business Beat calls it a full-size King Soopers with a pharmacy.
The hiring shows how many departments the store will run. The flyer lists openings in front end, pickup, produce, deli, bakery, meat and seafood, general merchandise and home, and day and overnight grocery. It also lists cashier, cake decorator, sanitation and customer service jobs. A Town of Parker hiring event for the new store was held at the existing King Soopers on Cottonwood Drive.
Right now, King Soopers' Parker store page lists three stores in town, and none of them is on the Pinery side of Parker Road:
- Cottonwood Drive, 17761 Cottonwood Dr.
- Crossing at Stonegate, 17031 Lincoln Ave.
- Stroh Ranch, 12959 S. Parker Rd.
Parker's other full-size grocery options are the Safeway at 11051 S. Parker Rd. and Whole Foods at 8665 Kings Point Way. The Prospector Lane store will be the fourth King Soopers with a Parker address, and the first one built at the Pinery end of Parker Road.
Wellspring Drive divides the two filings
Pinery Village is split into two filings, and Wellspring Drive is the dividing line. According to the Douglas County staff report for the latest approval, the area south of Wellspring Drive is Pinery Village Filing 1. Several earlier replats divided it into buildable lots, and one of those lots is the King Soopers site. North of Wellspring Drive is Filing 2, which commissioners have just divided into much smaller pieces.
| Filing 1 | Filing 2 | |
|---|---|---|
| Location | South of Wellspring Drive | Northwest corner of State Highway 83 and Wellspring Drive |
| Anchor | King Soopers, 132,000 sq. ft. | None yet |
| Lot layout | Buildable lots from several earlier replats | 19 commercial lots, 1.00 to 7.96 acres, plus three tracts |
| Total area | Not stated in the county report | 47.62 acres |
State Highway 83 is Parker Road. Filing 2 sits in what the county calls the Pinery Village Business Park Planning Area of the Pinery Planned Development. Its three tracts are set aside for drainage, utilities, private roads, open space and access. The 19 lots are reserved for future commercial development. To the north, the land is either zoned agricultural or inside the Town of Parker.
The county describes the Filing 2 site as undeveloped rolling terrain covered mostly in grasses and shrubs, sloping down toward Cherry Creek. On paper, that same grassland is already divided into 19 parcels.
The first proposals for the 19 lots
The replat, county file SB2026-015, received final approval on Aug. 4, 2026. Douglas County's Planning Pro record shows the file completed on Sept. 4. Requests for individual businesses followed almost immediately. Both are early-stage filings, not buildings.
- Coffee shop and oil change, Lot 8-B. File SP2026-120 is a site improvement plan for a coffee shop and an oil-change facility. The county accepted it on Aug. 21, 2026, and its listed marketing name is "Take 5 and 7 Brew Coffee." The file is active, and no final action has been recorded. (county record)
- Tractor Supply, Lot 14. File PS2026-222 is a presubmittal for a proposed Tractor Supply Company store. The county accepted it on Oct. 13, 2026, and it is active. A presubmittal comes before a formal site plan. (county record)
A drive-thru coffee stand, an oil-change bay and a farm-and-ranch retailer are everyday-errand businesses. Two of the 19 lots now have proposals like that attached. Together with the grocery store across Wellspring Drive, the filings point toward a single stop for errands on the Pinery side of Parker Road. The other 17 lots have no named tenants in the county files covered here. Lots range from 1.00 to 7.96 acres, so the district has room for both small pad buildings and larger stores.
The plan dates to 1982
New construction along Parker Road can look sudden. The plan behind this land is 44 years old. The staff report traces the steps:
- 1982. The Board of County Commissioners approved the Pinery Planned Development, which has always included commercial, business and light industrial uses in this part of The Pinery.
- By 1987. The plan was changed to keep the land along Cherry Creek as open space instead of the golf course first planned there. The land on the west side of Parker Road stayed marked for commercial use.
- March 24, 2026. Commissioners approved a minor development final plat that created three super-block lots and seven tracts on the Filing 2 site.
- Aug. 4, 2026. The replat split two of those super-block lots into the 19 commercial lots.
Seen this way, the King Soopers is the opening phase of a commercial area that has been on the county's plans for this side of Parker Road since 1982. The 2026 approvals turned that long-standing plan into parcels that can be sold, permitted and built on.
A second road into the site
Access is the most practical change for anyone who lives nearby. Per the staff report, the Filing 2 site is reached from Parker Road by Wellspring Drive and by a newer road, Pinery Center Boulevard. That road "is now open from N. Pinery Parkway to Wellspring Drive."
Pinery Center Boulevard is meant to go further. The same report says it "will be extended north to the Town of Parker" under the plat commissioners approved in March. Private drives and access easements inside the site will connect the individual lots. County engineering approved the project's traffic impact study. The required roadway improvements are identified and secured in the project's Subdivision Improvements Agreement.
Once the extension is built, Pinery Center Boulevard will connect N. Pinery Parkway, Wellspring Drive and the Town of Parker on the same side of Parker Road as the new lots.
Following the next filings
New lots in this district will show up in Douglas County's records before any construction starts. The county's Planning Pro project search is public, and each file above appears there under its file number with an acceptance date and a status. Elsewhere in town, Search Parker lists GQue BBQ as opening this month at Crown Point Center, 18424 Cottonwood Dr., in the former Freddy's building.
If you live near The Pinery and want to understand how the new commercial district along Parker Road might matter for a future sale or purchase on your street, Laura Cantalamessa follows these county filings closely and can walk you through them. Schedule a consultation whenever it's useful to you.